User Tag List

Thanks useful information Thanks useful information:  35
Page 2 of 10 FirstFirst 12345 ... LastLast
Results 21 to 40 of 198

Thread: ASIGN Observatory II is back on track!

  1. #21
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

  2. #22
    Arch-Σigmoid Ausphotography Regular ameerat42's Avatar
    Join Date
    18 Sep 2009
    Location
    Nthn Sydney
    Posts
    23,519
    Mentioned
    24 Post(s)
    Tagged
    0 Thread(s)
    A most noble goal, in all, Baz.
    Am.
    CC, Image editing OK.

  3. #23
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by ameerat42 View Post
    A most noble goal, in all, Baz.
    Am.
    Thanks mate. Visit the dome when it is done and you will understand why I want to share it!


  4. #24
    Member
    Join Date
    06 Aug 2012
    Location
    Werribee
    Posts
    7
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Hi Baz,

    Good to see I'm not the only idiot who put their observatory in the front yard!

    Mine looks a bit like a garden shed though, yours might attract a bit more attention.

    Looks like it's going to be a cracker though.

    Cheers
    Stuart

  5. #25
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by rat156 View Post
    Hi Baz,

    Good to see I'm not the only idiot who put their observatory in the front yard!

    Mine looks a bit like a garden shed though, yours might attract a bit more attention.

    Looks like it's going to be a cracker though.

    Cheers
    Stuart
    Hopefully it will attract a lot of attention. That's the idea. A bit hard to promote my cause if I hide it away and disguise it as a garden shed....

  6. #26
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Floor support ring on and floor joists assembled!


    The Southern Cross watches over the construction of ASIGN Observatory II.

  7. #27
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Here's this afternoon's progress. External walls on! Latest update http://www.asignobservatoryii.com/ob...nstruction.htm




  8. #28
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

  9. #29
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Last edited by AsignObservatory; 25-08-2012 at 11:55pm.

  10. #30
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    One small task at a time. Today my goal today was to build a door frame and door to fit it, out of steel.

    Done.


  11. #31
    Member
    Join Date
    24 Sep 2010
    Location
    Gembrook
    Posts
    1,019
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Great to see the progress you are making. Well done!
    I hear ACT is pretty cold... hope you'll have some insulation...... or a hot toddy!

  12. #32
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Thanks mate. I've got the cold covered!

    Marking out the flooring for the top floor ready for cutting into a whopping big circle!


    Swept and tidied, a bit of an idea of the space that will be available in the office downstairs.


    Full story here.

  13. #33
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Got a heap more bows on the revolving dome and cross-bars on the slot.


  14. #34
    Arch-Σigmoid Ausphotography Regular ameerat42's Avatar
    Join Date
    18 Sep 2009
    Location
    Nthn Sydney
    Posts
    23,519
    Mentioned
    24 Post(s)
    Tagged
    0 Thread(s)
    Just to let you know (in case the button doesn't) I'm following along with interest.
    Am.

  15. #35
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by ameerat42 View Post
    Just to let you know (in case the button doesn't) I'm following along with interest.
    Am.
    Hopefully I can keep you interested!

    Finally got the last of the heavy bows on the roof. I've been at it for roughly two hours every afternoon after work until I run out of light. I've even come home at lunch times to get 30 minutes of labour in at times. Time is so precious.

    The next step is to roll-form some lighter intermediate bows. Flat sheet to cover the dome will bend nicely one way, but not two ways, so trying to bend it over the large area between these heavy bows is likely to warp and distort them too much. Putting in some intermediate bows will mean thinner strips of sheet, reducing the need to bend them two ways.

    Full-story here


  16. #36
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    One of the hurdles I've had to overcome is that the old pier is not high enough to mount the telescope on, as the new floor level is now much higher.

    To solve this, I have built another wooden box like the one underneath, to be filled with reinforcing mesh along with some conduit to run electrical cabling. It will then be filled with concrete.

    Full story here

    1. Constructing the form-work for the new pier.

    2. Form-work in position on top of old pier.


    3. New pier extension topside.


    4. While I was at it, I skinned the door with thick steel sheet.

  17. #37
    Member
    Join Date
    12 Nov 2008
    Location
    Mundaring
    Posts
    1,688
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Also following this thread with interest Baz!

    Looking forward to seeing your hard work pay off!!
    Tim | Capturing God's Creation


    Canon 7D | Tokina 11-16 F/2.8 | Canon 400 F/5.6 | Canon 50 F/1.8 | Manfrotto CF Tripod | Cokin Z GND Filters | Lowepro 400AW | GoPro Hero 2 | Kwik Camo


  18. #38
    Member
    Join Date
    28 Dec 2009
    Location
    Yokine
    Posts
    984
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Every time I look at this thread you astound me with your diligence and determination.
    Wish I had a project that drove me like that.
    Keep at it mate. Like everyone else I'm watching this with great interest.
    Peter.

    Some of my photo's are at www.peterking.id.au

  19. #39
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Thanks Tim and Peter. That's very encouraging.

    Baz.

  20. #40
    Member
    Threadstarter

    Join Date
    31 May 2009
    Location
    Canberra
    Posts
    589
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    The race was on today as the rolled steel arrived to build the dome's sliding doors and complete the intermediate dome ribs. I say, "race" because tomorrow afternoon I have a professional welder coming over to weld stuff together.

    This afternoon I measured, cut and joined all the framing together for the sliding doors. I have used 20mm steel plate to join it all together with screws, that way the welder can just weld all the joints together, then I can remove the ugly plates and screws.

    Below: Picture 1 - One side complete. Picture 2 - The two halves will split sideways to open the dome slot.




Page 2 of 10 FirstFirst 12345 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •